Tag Archives: Product Owner

Product Backlog Refinement in SCRUM

16 Jun

Within the Scrum Framework – there are numerous GASPs (Generally Accepted Scrum Practices). The following 4 meetings are all GASPs:

• Sprint Planning
• Daily Stand-up
• Show and Tell/Sprint Review
• Sprint Retrospective

There have been efforts to include a 5th meeting to the list of GASPs:

• Product Backlog Refinement (PBR session)

AIM OF THE PBR SESSION
The overall aim of this meeting is to manage the product inventory and ensure that the product backlog (i.e. anything outside of a Sprint) is up-to-date. This is done through the following PBR activities:

I) Refinement:
• Progressively breaking down large items (EPICs) into smaller items (features/use cases etc) that can be implemented in a single Sprint
• Grouping items based on commonality (technical delivery/product goal etc)
• Adding detail – such as acceptance criteria – to items in order to generate a common understanding

II) Estimation:
• Pre-Sprint, high-level estimation of items in the product backlog will facilitate delivery planning
• Methods include – story point estimation (e.g. planning poker on the Fibonacci sequence), t-shirt sizes, bucket estimation, blink estimation

III) Prioritisation:
• Items are prioritised according to business value (this is primarily identified by the Product Owner/stakeholders/user data)
• Items are independent as per the INVEST criteria – therefore the order of items on the product backlog leads to a prioritised Sprint backlog

IV) “Ready” state:
• Items are discussed – with issues/questions/actions being identified
• Agreement on what needs to be done in order to get items into “Ready for development”/”Ready for Sprint”

V) Communication:
• Team understands the bigger picture – i.e. the vision beyond the current Sprint

VI) Ideation:
• New, high-level user stories are discussed and added to the Product Backlog
• Bringing together members of the business and technical team to discuss ideation facilitates collaborative product development within a cross-functional team

GENERAL FORMAT OF THE PBR SESSION
I) Timing:
• Regular – product priorities/understandings are dynamic. The product backlog must therefore be responsive to change. It is recommended that PBR sessions are held every Sprint or 2
• Scheduled – Typically mid Sprint in order to avoid conflict with the Sprint Planning/Show and Tell/Retrospectives
• Duration – Timeboxed – typically to 1.5 – 2 hours

II) Participants:
• The Product Owner is primarily responsible for the Product Backlog. The Scrum Master is responsible for facilitation and the removal of obstacles. Attendance of both is therefore mandatory
• Team members – invited – however attendance is optional. Details of which stories will be discussed in the session should be provided in advance (this enables users to decide whether or not to attend)
• Small number of stakeholders can be invited to assist with prioritisation. Representation from both the business and technical team is preferred

III) Agenda:
• The entire product backlog is not discussed. Instead the agenda should cover items that are likely to come up in the next 3-4 Sprints
• The session should aim to achieve the following:
•• Agreement on story breakdown/high level definition
•• High-level estimation
•• Item prioritisation
•• Agreement on actions necessary to get items into a “Ready” state
•• Discussion of any new ideas
• At a high level – the aim of the PBR session is to ensure that items in the Product Backlog meet the DEEP criteria (Detailed Appropriately, Estimated, Emergent and Prioritised)

Advertisement

Applying Agile principles to requirement analysis

23 May

Background

The Agile methodology originated within the software development industry. Since its inception in 2001 – Agile has expanded beyond an initial developer-centric community – to being embraced by multi-discipline teams working across numerous industries.

The antecedent of Agile within IT was the Waterfall methodology. The Waterfall framework consisted of a series of sequential, discrete phases – with each phase conveniently mapped to a role/responsibly:

Analysis Phase             -> Requirement Analysis (Business Analysts/Product Owners)

Design Phase                -> UX (Designers/Usability Experts)

Development Phase  -> Software Development (Developers)

Testing Phase               -> QA (Manual Testers and Developers in Test)

Delivery Phase             -> Release Management (Project Managers)

Due to the increasing popularity of Agile – requirement analysis has been encouraged to transition from being a stand-alone phase owned by BAs/POs – to become a project facet that can incorporate Agile principles.

In what ways can requirement analysis adopt Agile principles?

Collaborative requirement analysis

Prior to Agile – the practice of the development team being presented with an upfront, non-negotiable, detailed requirements document (BRD/functional specification etc) was common. With the advent of Agile – requirement analysis should no longer be restricted to the interaction between BAs/POs and the business – instead we should embrace collaborative requirement analysis:

A popular collaborative requirement technique is the “3 Amigos”.  This process involves the developer, BA and QA discussing the requirement specification in a workshop. Each Amigo will offer a unique perspective – through discussions the Amigos will identify edge cases, undefined requirements, opportunities and potential reuse. The 3 Amigos technique can also reduce the risk of incomplete features being pushed into development by the product team – requirement specifications must be pulled into development when they have been reviewed and accepted by the 3 Amigos.

Collaborative requirement analysis facilitates a project-wide sense of ownership – and also communicates a common understanding of what features need to be built. Collaborative requirement analysis produces more robust specifications – and reduces the role-based silos that can exist on projects.

Detail as an emergent property

Agile artefacts such as technical spikes and development iterations mean that high-level requirements can be considered sufficient at project initiation. Low fidelity requirement assets (e.g. user stories /”back of the napkin” designs) should be employed on Agile projects:

Just-in-time requirements analysis (JITRA) has a concept that requirements should only be specified at the level of detail required for upcoming development. JITRA states that the further in advance of development requirements are defined – the more probable that requirements will become out of date, leading to rework and wasted effort.

Detail should emerge when it is required – which is typically towards the middle/end of the project lifecycle. Initial requirement analysis should be focussed on business justification and solution scope.

Embrace change

Specifications will evolve throughout the project lifecycle; all team members must acknowledge the benefit of responding to change. Adapting to changes in circumstances/urgency/understanding is crucial – requirement analysis should be considered an iterative rather than exhaustive process:

In terms of systems theory – project teams should be viewed as open systems. As the system will tend towards a steady state – change should be encouraged and communicated at an organisational level. Regular priority sessions, stakeholder workshops and competitor reviews should be used to mitigate resistance to change.

Incorporating feedback is crucial to the success of a project. Requirements are not unchangeable statements – they only reflect the current and expected situation, both of which are liable to change.

Necessary documentation

The adoption of Agile principles does not mean that requirements should not be documented. Requirement documentation is vital for developers, QA and the business stakeholders:

The principle of living documentation should be embraced. This means that all documentation needs to be accessible and up-to date. Business users, developers and QA should be able to request requirement changes. Documentation is most valuable when it is understandable by all team members, available and responsive to change.

Lightweight documentation such as feature files and high level process maps summarise the output of the requirement analysis process. The Agile methodology encourages appropriate documentation – superfluous detail is wasted effort; Agile does not negate documentation.

Continuous process improvement

Requirement processes should not be viewed as immovable obstacles. Instead these processes should evolve and adapt to meet the needs of the project. Where a process or artefact ceases to produce the expected value –it should be reviewed and changed by a self-organising team:

Retrospectives are a popular technique for identifying improvement opportunities. Team members meet to discuss what the team needs start doing, stop doing, and continue doing. Regular (every 2/3 weeks) and actionable retrospectives provide an open forum for continuous process improvement.

Requirement analysis processes (to-be-analysis, process mapping, stakeholder workshops etc) can always be improved. A technique that is effective for one team – may not be effective for another – or at least may require several modifications.

Continuous delivery

The Agile methodology promotes product iterations and regular releases. In order to align with this ethos, requirement analysis must produce a constant output – a steady flow of requirements will avoid the “big bang” requirement delivery that characterised the Waterfall methodology:

Minimum Viable Product (MVP) provides the scope of requirement analysis. The MVP will be delivered in multiple iterations – requirement analysis must be constantly baselined against the MVP and ensure that there is a sufficient specification available for each delivery.

Shorter delivery timescales encourages more frequent requirement analysis output. Specifications should be aligned to the MVP – features need to be deliverable and contribute to the MVP vision.

Conclusion

Iterative, collaborative Agile development has replaced the sequential Waterfall development methodology. Prior to Agile – the product team could hand over a list of detailed requirements – which would then be used by developers to build the product. In order to align requirement analysis with Agile development practices – the following principles need to be applied: requirement collaboration, iterative specifications, embracing change, necessary documentation, continuous improvement and continuous delivery. By adopting these principles requirement analysis will transition into the Agile world, produce better specifications and ultimately lead to greater quality products.

How 2 types of BA can transition from Waterfall to Agile

25 Apr

Introduction

Most BAs have experience of traditional Waterfall development. Within the Waterfall framework there are the following sequential phases:

-> Analysis
-> Design
-> Development
-> Testing
-> Delivery

Waterfall projects kick-off with an “Analysis” phase. This is designed to assess the problem and scope out a solution (as-is and to-be analysis). The project will then progress through the remaining discrete phases – until the product is delivered.

In the same way that the “Design” phase had designers, the “Testing” phase had testers, the “Analysis” phases had analysts (BAs).

After working on a number of Waterfall projects – I noticed that 2 types of BA evolved.

TYPE A (“Specialists”/”Purists”)

• These individuals were lucky enough to work in a mature BA practice. The analyst role was well established – BA deliverables were often standardised (e.g. BRD templates/peer review)
• They focused primarily on the “Analysis” phase of a project – in the same way that designers focused on the “Design” phase
• When the “Analysis” phase was complete – they moved onto another project. It wasn’t uncommon for a BA to work on multiple projects/workstreams simultaneously

TYPE B (“Generalists”)

• These individuals almost had to define their own roles. They worked in organisations where the BA role/responsibilities weren’t fully understood
• BAs were treated as generalists. They were often asked to “do a bit of everything”
• Their deliverables stretched across the project lifecycle and included: requirement specs (“Analysis” phase), wireframes/low fidelity mock-ups (“Design” phase), clarifying queries from the dev team (“Development” phase), testing the product (“Testing” phase) and creating user guides/training end-users (“Delivery” phase)
• These individuals worked on individual projects – and were often influential

How can these 2 types transition into Agile?

TYPE A (”Specialists”/“Purists”)
• These individuals can continue to focus on specifying new features (i.e. requirements/acceptance criteria). In order to maintain a purist approach they will need to work 1 Sprint ahead of the developers. Most of the work they produce will go into the following development Sprint
• Career progression -> Senior BA role

TYPE B (“Generalists”)
• These individuals can continue to focus on a diverse range of deliverables: they can produce requirement specifications, provide design feedback, facilitate product planning, support development and perform ad-hoc testing. In order to provide the developers with a constant backlog of work – they will need to spend 50% of their time on the current Sprint and 50% of their time on the upcoming Sprint.
• Career progression -> Product Owner (possibly also Scrum Master role)

Thoughts/feedback?

What is your opinion? Are there TYPE As and TYPE Bs? Where do they fit in an Agile world?

Image

Using Google to translate business requirements

21 Apr

google_translate

Just-in-time Requirements Analysis (JITRA)

20 Apr

Introduction

Just-in-time requirements analysis (JITRA) is a BA approach based on lean/agile/kanban practices.

The 2 principles underlying JITRA are that requirements:

  • Should ONLY be identified when they are needed; and
  • Should ONLY be defined at the level of detail required

The first principle aims to optimize the timing of requirements; requirements should be delivered based on need rather than convenience (e.g.the  development team needs this next – versus – this feature can be specified easily).

The second principle aims to optimize the cost of requirements; superfluous detail is a waste of effort – and ultimately money.

Time and costing are often finite resources on a project. JITRA aims to optimize both from a requirements perspective.

Implementation

The most widely accepted framework for implementing JITRA principles breaks analysis down into 4 major activities:

  • Initial Analysis
  • Feature Set Analysis
  • Story Analysis
  • After-action Analysis

For a detailed description of each stage – please refer to: http://cf.agilealliance.org/articles/system/article/file/1007/file.pdf

Challenges

Teams that implement JITRA often face perceived challenges from a range of stakeholders:

  • BA: “Without a buffer – requirements might not be ready on time. I don’t know how long it will take to analyse the requirements until I begin!”
  • PM: “Without detailed analysis at the start of the project – how can I estimate the delivery date!”
  • Developers: “Isn’t this just product leaving it until the last minute – and giving developers incomplete requirements!”

Although these perceived challenges could stop a team from experimenting with JITRA principles – there are strong advantages to the approach.

Advantages

  • Agile: JITRA reiterates that the Business Analyst should work on features that can go straight into the backlog. This should provide the development team with a continuous flow of requirements and avoid a “BA bottleneck”. Additionally – as requirements don’t need to be fully specified upfront – JITRA enables requirement details to emerge during iterations.
  • BA perspective: the further in advance of development that requirements are defined – the more likely they are to become out of date. This in itself will lead to rework and ultimately require more analysis effort. With JITRA all three of these issues should be addressed.
  • Quality: the closer to delivery requirements can be left – the more information a BA has on which to build. This will lead to more valuable requirements.
  • Developers: Product requirements typically exist at a high level – the BA provides the detail. One problem with this approach is that if a BA provides details far in advance – one or two specific (and probably minor/low value) detailed requirements could cause considerable development challenges. If the BA provides initial high level requirements – then the development team can present back a set of options for  detailed requirement – the development team can also quantify these options in terms of effort/risk/ technical elegance.
  • PM: This approach requires a smaller upfront investment from the BAs. It also reduces waste from the requirements stage  – as there is less BA rework and less redundant effort.

Low Fidelity vs High Fidelity

9 Mar

Low fidelity assets are frequently employed on Agile projects. An example of a low fidelity asset is the production of basic wireframes/”back of the napkin” designs:

Screen Shot 2013-03-09 at 22.21.34

The advantage low fidelity designs is that they encourage feedback and corresponding design iterations – without the waste/overhead involved in high fidelity assets.

In terms of the Business Analyst role on Agile projects – low fidelity assets may include:

  • User stories
  • High level requirements (basic specification)
  • High level acceptance criteria (basic user acceptance conditions)

What are the advantages of the Business Analyst employing the above mentioned low fidelity assets:

  • They encourage a focus on the essential behavior of the system (MOSCOW must haves). This ensures the Minimum Viable Product (MVP) is documented early in the project lifecycle.
  • Facilitates communication across a project. Low fidelity assets encourage feedback – they are much easier to present and convey than a 30 page BRD.
  • Mitigates the risk of mistakes entering into detailed requirement specifications – assumptions can be identified earlier on.
  • Descriptive vs prescriptive. The focus is on the high level functionality – this means that the technical solution is less constrained by non-essential elements of the product specification.
  • Easily produced and maintainable – changes can be made quickly and with minimum effort. This sits well in the Agile world.
  • Stand-alone pieces of work (features) can be identified – this enables backlog prioritization.
  • Fidelity (i.e. detail) is added through participative iterations – documentation evolves through collaboration into a steady state.

Product Owners vs Business Analysts – MOSTly different roles?

14 Feb

The MOST acronym (Mission, Objectives, Strategy, Tactics) can be used to describe the main differences between the Product Owner and Business Analyst roles on a project.

Mission

  • This is the vision statement for the product. It should be concise and value driven.
  • This will provide answers to the following questions: What is the intention and long term direction of the product? Who is the user-base/target market? What is the business benefit?
  • Example: “We want to deliver the most popular Sports app in the World – with unparalleled journalist content”
  • Responsibility of the Product Owner.

Objectives

  • These are derived from the product mission. These are targets that will translate the product mission into reality.
  • These will provide answers to the following questions: What goals will lead us to achieve our mission? What will need to be created? What will need to be changed? What will need to be acquired?
  • Example: “We need to deliver live video streaming in the iOS app
  • Responsibility of the Business Analyst.

Strategy

  • This is a description of how success will be achieved. This should describe the features and their prioritisation.
  • This will provide answers to the following questions: How will the product scope be delivered across iterations? What is the Minimum Viable Product for release 1.0/launch? Which features are nice-to-haves?
  • Example: “Pundit analysis, live video & match statistics are required for the first release – personalisation will be delivered in the second release of the app” 
  • Responsibility of the Product Owner.

Tactics

  • These are derived from the product strategy. These are the deliverables that will be provided by the development team.
  • These will provide answers to the following questions: How can we achieve tangible benefits in the next Sprints? What tasks need to be completed? How can work be grouped together logically & in terms of delivery?
  • Example: “Provide live streaming of our CMS videos using Media Player”
  • Responsibility of the Business Analyst.

Summary

Within MOST there are 2 definition activities (Mission and Objectives) and 2 planning activities (Strategy and Tactics).

  • The Mission (high level product definition) is done by the Product Owner.
  • The Objectives (detailed product definition) is done by the Business Analyst.
  • The Strategy (high level product planning) is done by the Product Owner.
  • The Tactics (detailed product planning) is done by the Business Analyst.