Product Backlog Refinement in SCRUM

16 Jun

Within the Scrum Framework – there are numerous GASPs (Generally Accepted Scrum Practices). The following 4 meetings are all GASPs:

• Sprint Planning
• Daily Stand-up
• Show and Tell/Sprint Review
• Sprint Retrospective

There have been efforts to include a 5th meeting to the list of GASPs:

• Product Backlog Refinement (PBR session)

AIM OF THE PBR SESSION
The overall aim of this meeting is to manage the product inventory and ensure that the product backlog (i.e. anything outside of a Sprint) is up-to-date. This is done through the following PBR activities:

I) Refinement:
• Progressively breaking down large items (EPICs) into smaller items (features/use cases etc) that can be implemented in a single Sprint
• Grouping items based on commonality (technical delivery/product goal etc)
• Adding detail – such as acceptance criteria – to items in order to generate a common understanding

II) Estimation:
• Pre-Sprint, high-level estimation of items in the product backlog will facilitate delivery planning
• Methods include – story point estimation (e.g. planning poker on the Fibonacci sequence), t-shirt sizes, bucket estimation, blink estimation

III) Prioritisation:
• Items are prioritised according to business value (this is primarily identified by the Product Owner/stakeholders/user data)
• Items are independent as per the INVEST criteria – therefore the order of items on the product backlog leads to a prioritised Sprint backlog

IV) “Ready” state:
• Items are discussed – with issues/questions/actions being identified
• Agreement on what needs to be done in order to get items into “Ready for development”/”Ready for Sprint”

V) Communication:
• Team understands the bigger picture – i.e. the vision beyond the current Sprint

VI) Ideation:
• New, high-level user stories are discussed and added to the Product Backlog
• Bringing together members of the business and technical team to discuss ideation facilitates collaborative product development within a cross-functional team

GENERAL FORMAT OF THE PBR SESSION
I) Timing:
• Regular – product priorities/understandings are dynamic. The product backlog must therefore be responsive to change. It is recommended that PBR sessions are held every Sprint or 2
• Scheduled – Typically mid Sprint in order to avoid conflict with the Sprint Planning/Show and Tell/Retrospectives
• Duration – Timeboxed – typically to 1.5 – 2 hours

II) Participants:
• The Product Owner is primarily responsible for the Product Backlog. The Scrum Master is responsible for facilitation and the removal of obstacles. Attendance of both is therefore mandatory
• Team members – invited – however attendance is optional. Details of which stories will be discussed in the session should be provided in advance (this enables users to decide whether or not to attend)
• Small number of stakeholders can be invited to assist with prioritisation. Representation from both the business and technical team is preferred

III) Agenda:
• The entire product backlog is not discussed. Instead the agenda should cover items that are likely to come up in the next 3-4 Sprints
• The session should aim to achieve the following:
•• Agreement on story breakdown/high level definition
•• High-level estimation
•• Item prioritisation
•• Agreement on actions necessary to get items into a “Ready” state
•• Discussion of any new ideas
• At a high level – the aim of the PBR session is to ensure that items in the Product Backlog meet the DEEP criteria (Detailed Appropriately, Estimated, Emergent and Prioritised)